As-Built Drawings Services in Dubai
Site mark-ups turned into accurate as-built drawings and record models for project handover, authority completion and facility management, for contractors and consultants in Dubai and across the UAE.
Close Out Projects Without a Drawing Backlog
At the end of a UAE project, the as-built drawings are often the last thing standing between the contractor and handover. Months of site changes live in marked-up prints and on the site engineers' phones, the drawing team has already moved to the next project, and the client, the consultant and the authorities all need accurate records before the job can close.
Our as-built drawings services in Dubai turn those mark-ups into clean, accurate drawings. We update your approved shop drawings with every change recorded on site, coordinate the disciplines so the records agree with each other, and deliver as-built drawings and, where required, as-built Revit models in your template and to your handover requirements.

As-Built Drawings We Deliver
Accurate records of what was built, discipline by discipline.
MEP As-Built Drawings
HVAC, plumbing and drainage, fire fighting, electrical and ELV as-builts showing installed routes, sizes, levels and equipment.
Architectural As-Built Drawings
Plans, elevations, sections and ceiling layouts updated to the final constructed layout and finishes.
Red-Line Mark-Up Conversion
Hand mark-ups and site sketches from your engineers transferred accurately onto the drawings.
As-Built BIM Models
Revit models updated to the installed works for clients who require BIM at handover.
Facility Management Drawings
Clear room numbering, equipment tags and layouts to support operation and maintenance teams.
Scan to As-Built
As-built drawings or models drafted from laser scan point clouds when the existing records are unreliable.
Software We Use
We update drawings in the platform they were created in, so your as-built set keeps the same layers, title block and numbering as the approved shop drawings, and models stay usable for the client's facility team.
Built for Handover Requirements
Clients, consultants, master developers and authorities each have their own handover expectations. We follow the drawing format, numbering and revision conventions your project requires, and keep every discipline consistent so the record set tells one story.
- Your title block, sheet numbering and revision format
- Disciplines cross-checked so the as-built set agrees
- Anything unclear in the mark-ups flagged before it is drawn
Our As-Built Drawings Process
Collect the mark-ups
Approved shop drawings, site red-lines, photos and measurements.
Scope and quote
We review the information, list any gaps and confirm a fixed price in AED.
Update the drawings
Changes drafted discipline by discipline and cross-checked.
Check and hand over
Your team verifies; we issue the final as-built set and models.
Turnaround and Quotes
As-built packages are scheduled by scope and delivered discipline by discipline, so your team can start checking while we finish the rest. Every job is quoted at a fixed price in UAE dirhams before work starts, and questions about mark-ups are answered during your working day.
See how our process works, or message us to discuss a project.
Pricing on Request (AED)
Send your mark-ups and we confirm scope, price and delivery date before any work begins.
Get a Free Sample DrawingWhy UAE Contractors Outsource As-Built Drawings to Us
Faster Close-Out
Clear the as-built backlog while your team moves to the next project.
Your Working Hours
Questions about mark-ups answered the same day on a call or WhatsApp.
Consistent Records
Disciplines cross-checked so the handover set agrees.
CAD or BIM
As-built drawings in AutoCAD, models in Revit, in your template.